We serve homes across NW London after checking the postcode and the job.
See the Areas page
.
A kitchen rewire starts with the real renovation context. The best first answer usually comes from the
kitchen layout, appliance list, useful photos and timing notes, not from a one-line request for a price.
A kitchen rewire quote is much clearer once the layout and appliance list are known. A rough plan is
still better than guessing from the word kitchen alone.
What this usually means
Kitchen electrical scope can change quickly once appliances, cabinets, splashbacks, walls and access
routes are understood. Good first information helps separate a planned kitchen rewire from a smaller
accessory job, lighting change, EICR or consumer-unit question.
What to send first
Your postcode and the kitchen layout, fitter drawing or rough sketch if you have one.
A list of appliances, especially hob, oven, cooker, extractor, dishwasher, washing machine and fridge
freezer details.
Photos of the existing kitchen, likely worktop areas, current sockets or switches, and the consumer
unit if it is easy to photograph safely.
Any planned first-fix, plastering, cabinet fitting or second-fix dates.
What the first answer can usually confirm
Whether this looks like a kitchen rewire quote rather than a small-job visit.
Whether the consumer unit, current circuits or recent EICR comments need checking before the kitchen
scope is fixed.
What extra information is needed before a written quote or site visit makes sense.
What can change the scope
No layout or appliance list yet can make the quote provisional.
Changing from gas to electric cooking, adding an induction hob or moving appliances can change the
electrical scope.
Hidden routes, closed ceilings, tiling plans or fitted cabinets can affect access and timing.